Route for the transmission lines is Nevada Hydro's proposal to build a Hydro-Electric Plant above Lake
Elsinore which would entitle them to an interconnect power line from the Plant
to the "grid". The project is referred to as the
Lake Elsinore
Advanced Pump
Storage project (LEAPS).
This power line
interconnect is what EVMWD
- Nevada Hydro wants to expand it's scope and build a 33 mile, 500 kv
high-voltage transmission
line across the mountains. The proposed power line would stretch from Perris to
Horsethief Canyon through the Elsinore area onto La Cresta, Tenaja, Camp
Pendelton and on into San Diego County. The
governing / deciding agency would be Federal Energy Regulatory Commission (FERC) because the line is partially planned
to go through the Cleveland National Forest.
- The
EVMWD web site has links on the status of the LEAPS project and FERC
documents.
|